

Preview · in Slack
#general
Theo Lambert4:55 PM
okay but seriously, look at
— that's the entire vibe of the launch
1132Inline at 22px like Slack renders it. Reactions are pills with the emoji + count.
How to add :msproject: to Slack
- Download the original
PNGabove. It's already sized 128×128 — exactly what Slack wants. - In Slack, open any message box and click the smiley face, then choose Add Emoji.
- Upload the file and name it . Hit Save.
- Type in any channel — your workspace now has it forever.
Need it for a different chat app? PNG and GIF emoji work the same way in Discord, Mattermost, Rocket.Chat, and most modern chat tools.
About this sticker
Filed under Random, msproject renders as a static PNG (128×121). Slack will display it inline at 22px and bump it to 32px when used as a reaction.
No account, no signup, no ads. msproject downloads as a single PNG file you can drag straight into Slack's emoji uploader.









